Please make sure Lewis County PUD knows before your system is connected to the electric grid.
Notifying us isn't just paperwork—it helps protect you, our crews, and the reliability of the electric system.
Here's why it's important:
• Ensures your system is installed and interconnected safely.
• Helps protect line crew who may be restoring power during an outage.
• Verifies your meter is configured correctly to accurately measure energy and allows your account to be set up properly to bank any excess energy your system produces.
• Helps prevent unexpected issues with your electrical service.
• Keeps your system in compliance with our interconnection requirements.
If you're planning a solar installation or if your system is already installed but hasn't been reported—please contact our Energy Services team. We're happy to walk you through the process and help ensure everything is connected safely and correctly.
Learn more about our net metering and interconnection requirements.
