Schedule 20

LIGHTING AND POWER SERVICE

AVAILABILITY:

This schedule is available throughout the entire territory served by the District. This schedule applies to energy used for lighting and power purposes.

CHARACTER OF SERVICE:

Service to be furnished under this schedule shall be single phase or three phase, 60 cycle, alternating current at such voltages as the District has available. Single and three phase service may be combined through one meter.

RATE:

Basic Charge:
             $0.40 per day for single phase and $0.94 per day for three phase, plus

           Energy Charge:
                        $0.0455 for the first 15,000 kilowatt hours per month, plus
                        $0.03044 for all over 15,000 kilowatt hours per month, plus

           Demand Charge:
                        First 50 kilowatts of billing demand - no demand charge
                        Excess over 50 kilowatts at $4.84 per kilowatt per month of billing demand

MINIMUM CHARGE:

The minimum charge shall be the basic charge; or may at the option of the District be $0.50 per kilowatt of connected load; or $0.50 per kilowatt of transformer capacity required to serve the customer’s load.


DETERMINATION OF DEMAND:

The demand shall be determined by the installation of a demand meter. The demand for the month shall be the average kilowatt delivery of the fifteen-minute interval in which the utilization of electrical energy is greater than in any other fifteen-minute interval in that month. Where the load is subject to excessive fluctuations, the demand measuring interval may be five minutes at the option of the District. The demand is to be expressed in kilowatts to the nearest kilowatt.


POWER FACTOR:

The District shall not be obligated under the terms of this schedule to deliver energy to the customer at any time the power factor of the customer’s load is below 80% lagging. When the power factor of the customer’s load shall fall below 95% lagging, as indicated by a test meter installed to measure power factor, the billing demand shall be determined by multiplying the measured demand by 95% and dividing this amount by the actual power factor, expressed in percent, as determined by test or measurement.

TAX ADDITIONS:

The above rate is subject to proportional increases to compensate for any gross revenue, kilowatt hour, or other form of tax hereafter imposed by any municipal, state or federal taxing body, in accordance with provisions of Schedule X-2.